Tuesday, October 19, 2010
Construction on cut-through near Washington Blvd.
Be advised that the cut-through that links the W&OD to 19th St. near East Falls Church has ripped up pavement, down to mud. Some have ridden through, but be prepared to dismount if conditions warrant.
Subscribe to:
Posts (Atom)