Tuesday, October 19, 2010

Construction on cut-through near Washington Blvd.

Be advised that the cut-through that links the W&OD to 19th St. near East Falls Church has ripped up pavement, down to mud. Some have ridden through, but be prepared to dismount if conditions warrant.